Recommend
Share
Tagged in
Case Study

TINTERN ROAD Ph2 - COUNTRYSIDE


Client - Countryside Properties

Project Type -  New build timber frame properties for site on Tintern Road, Middleton.

Job Specification - Timber frame, I-Joist floor cassettes, Roof trusses.

Description - 

Beginning January 2018; Wyder are designing, supplying and installing timber frame wall panels, floor cassettes and roof trusses for Countryside Properties at their Tintern Road site in Middleton. Phase 2 of Tintern Road consists of 38 new 2, 3 and 4 bed timber frame houses. The timber frame wall panels supplied for this project are pre-insulated with Hybris insulation in the factory to save time on site. As well as walls, floors and roof trusses, Wyder are also supplying and installing the soleplate, DPC and cavity battens/ socks.
Deprecated: Function create_function() is deprecated in /home/sites/wydertimber.co.uk/public_html/wp-content/plugins/seo-ultimate/includes/jlfunctions/arr.php on line 64